Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/basestor/public_html/stalbansbasement/dev/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the video-embed-thumbnail-generator domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/basestor/public_html/stalbansbasement/dev/wp-includes/functions.php on line 6170
Ottway Walk - St Albans Basements
Back

Ottway Walk

Welwyn

A private home owner commissioned us to undertake the basement, substructure foundations and ground floor construction of their project.

The basement waterproofing was a drain cavity membrane system combined with Sika waterproof concrete, both fully guaranteed.

We delivered the substructure works ready for the client’s new timber frame home to sit above, working closely with the client’s design team to deliver the basement’s shell  ready for the client’s future use — to include a golf simulator.

Residential

New Build Basement Construction

Basement: 95m²

Basement: 6 weeks

If you’re ready to start your basement construction journey, trust St Albans Basement to make your vision a reality. Contact us to schedule a consultation and discover why we’re one of the most respected basement construction companies in London. Let’s create a space that’s not only functional but also truly extraordinary.